A defect log the responsible Tradie can actually update

A defect noted on a walkthrough usually lives in a phone photo or a text to whoever's responsible, with no record of when it was rectified or by whom -- and no way for the subcontractor to close it out themselves. Novato logs a defect against the project and the subcontractor, and gives that subcontractor their own portal link to update it directly.

A project's Defect Register showing a logged defect with its severity, phase, and status

How it works

1

Report a defect

Location on site, severity, which subcontractor is responsible, and photos.

2

The responsible subcontractor is notified automatically

A no-login portal link, specific to them, so the person who actually has to fix it hears about it directly -- not relayed by the GC.

3

They rectify it and upload evidence themselves

Rectification notes and photos go straight into the record, through their own link, no login required.

4

Track status by severity and phase

Filter by status, severity, and project phase -- and download an owner/occupier QR poster so anyone on site can report one directly.

How this fits Australian WHS compliance

Every defect keeps a timestamped record of when it was reported, who it was assigned to, and when it was actually rectified -- real evidence if a defect's handling is ever challenged. A subcontractor's own no-login portal link means the person actually responsible has a direct channel to close it out, not a relay through the GC.

Common questions

Does the subcontractor need a Novato login to update a defect?

No -- they get their own no-login portal link, specific to them and the defect, the same posture as every other subcontractor-facing link in Novato.

Can anyone on site report a defect, not just the GC?

Yes -- a downloadable owner/occupier QR poster links straight to a reporting form, so a defect can be flagged by whoever actually notices it.

What severities does Novato track?

Safety critical, major, minor, and cosmetic -- filterable alongside status and project phase, so a genuinely urgent defect doesn't get lost in a long list.

Is a defect tied to a specific subcontractor, or just the project generally?

A defect can be assigned to the specific subcontractor responsible, which is what triggers their own portal-link notification -- it doesn't have to be, but assigning it is what makes it directly actionable for them.

Which plan includes the Defects Register?

Shield and Armor -- see Pricing for the full comparison.