[ Novato Vault ]
The same subcontractor uploads the same White Card and public liability certificate to every GC they work for, over and over, and every GC re-verifies a document someone else already checked. Novato Vault gives the subbie one place to keep their documents and decide who sees them — a document they've shared with you stays live for every project and every new requirement, not just the one it was uploaded against.

In their own Novato Subbie account — upload a licence, insurance certificate, or induction card once, not once per GC.
Access is granted per GC and per document — a subbie decides exactly what a given contractor can see, not an all-or-nothing share.
A shared document is matched against your project's real requirements automatically, and shows up as a real record ready for review — not a copy, a link back to the one document the subbie actually controls.
Add a new required document to a project after the share already happened, and an already-granted document that satisfies it links in on its own — no need to ask the subbie to re-upload or re-share.
A shared vault document still goes through the same review and, where a live register exists, the same licence verification every other upload does — sharing skips the re-upload, never the check. The audit trail always points back to the one document the subcontractor actually controls, so there's never a question of which copy is current.
No — a Novato Vault-shared document lands in your Review queue the same as any upload, showing as "awaiting verification" until you or an automated register check clears it. Sharing removes the re-upload step, not the review.
Yes — access is granted per GC, and per document within that GC. A subbie working for several contractors decides exactly what each one can see.
The document stops being available to link against new requirements. If it's already covering an active project assignment, revoking is blocked until that assignment ends, so a live compliance record can't disappear out from under a project mid-way through.
Yes — adding a requirement to an existing project re-checks every already-granted document from that subcontractor's vault, and links in anything that satisfies it, without anyone needing to re-share.
Armor — see Pricing for the full comparison.
No — a subcontractor's own Novato Vault account is free, with no plan, trial, or payment details required. Armor is what a GC pays for; the subbie side of the relationship never carries a cost.